What a full event production BOQ should include (and what usually gets left out)

The line items a thorough event production bill of quantities covers, and the ones that quietly go missing from vendor proposals.

A complete event production BOQ should cover design and project management, staging and structure, AV (audio, video, lighting), power and rigging, furniture and set dressing, logistics and transport, crew labour for build, show days and strike, and contingency. The items that most often get left out of vendor quotes are on-show standby crew, rigging or venue service fees, power distribution beyond a basic feed, insurance, and de-rig/waste removal — ask for each explicitly rather than assuming it is bundled in.

Why "one number" quotes cause budget problems later

A BOQ that lists a single total for "production" tells you almost nothing about what happens if the show adds a session, moves a stage, or needs an extra screen on day two. A properly itemised BOQ lets you see exactly what you are paying for, compare vendors fairly, and negotiate specific line items instead of an opaque lump sum.

The core categories a complete BOQ should cover

  • Design and project management: concept design, technical drawings, PM hours across the full timeline
  • Staging and structure: stage decks, backdrops, branded set pieces, any rigging structure
  • AV: audio system and mixing, video/LED screens and content playback, lighting design and fixtures
  • Power and rigging: generator or venue power feed, distribution, rigging points and load calculations
  • Furniture and set dressing: seating, registration furniture, lounge or breakout furniture, plants and dressing
  • Logistics and transport: freight, local transport, storage before and during the event
  • Crew and labour: build crew, show-day operators and technicians, standby crew, strike crew
  • Insurance and compliance: public liability, equipment insurance, any venue-mandated certifications
  • Contingency: typically 5–10% held against last-minute changes

The items that most often quietly disappear from a quote

  • On-show standby crew — assumed to be "covered" but often not itemised or budgeted for the full run of the event
  • Rigging and venue service fees — sometimes listed as "as per venue" with no number attached
  • Power distribution beyond a single feed — additional distribution boards, cabling runs and backup power
  • Insurance — sometimes assumed to be the venue's responsibility when it is not
  • De-rig and waste removal — often excluded or charged separately after the event
  • Late-night or overtime labour rates for extended show days

How to pressure-test a vendor's BOQ

Ask the vendor to walk through the BOQ line by line and explain what is and is not included under each heading, rather than accepting a summary. Ask specifically: "Is standby crew included for every show day, or just build and strike?" and "Is rigging a confirmed number or an estimate pending venue confirmation?" Vague answers to either question are a signal the final invoice may not match the original quote.

Using the BOQ to compare vendors fairly

Once you have two or three BOQs in the same format, compare category by category rather than by bottom-line total. A lower total that excludes standby crew and rigging fees is not actually a lower cost — it is a cost that has been moved off the page and onto a change order during the event.

Frequently asked questions

What is the difference between a BOQ and a general proposal?

A BOQ itemises every quantity and cost — number of lighting fixtures, metres of truss, hours of crew labour — while a general proposal may describe the scope in prose with a single total. A BOQ is what allows a fair line-by-line comparison between vendors.

What percentage should contingency be?

Five to ten percent of the total production budget is a reasonable range for most corporate events, higher for complex multi-day productions or events with a live broadcast element.

Should insurance be in the production BOQ or the venue contract?

Confirm this explicitly — it is one of the most common gaps between a venue contract and a production BOQ, and neither party should assume the other has it covered.

Why do vendors leave standby crew out of quotes?

Sometimes to make the headline total look lower, sometimes because it is genuinely assumed to be covered by build crew staying on. Either way, ask for it as an explicit line so there is no ambiguity on show day.

Get a fully itemised production BOQ