Exhibitor checklist for GITEX, Arab Health, Gulfood & BIG 5

Booking deadlines, build timelines, AV spec, hospitality and on-show standby for the four shows that define the GCC calendar.

For GITEX, Arab Health, Gulfood and BIG 5, the exhibitor checklist runs across six tracks: floor space booking (12+ months out), stand contractor appointment (4–6 months out), creative and content lock (3 months out), AV and demo rig (8 weeks out), hospitality and meeting planning (6 weeks out) and on-show standby and lead capture (live). Each of these shows has venue-specific quirks — DWTC rigging fees, ADNEC double-storey rules, build-up windows that compress fast.

GITEX (Dubai, DWTC + Expo City)

Largest tech show in the region. Aggressive build-up window. Hanging structures and LED-heavy stands are the norm. Book hall position 9–12 months out for prime locations. Brief contractor by month 4.

Arab Health (Dubai, DWTC)

Healthcare and med-tech buyers across the Middle East and Africa. Quieter visually than GITEX, but meeting density is high. Hospitality and meeting pods drive ROI more than hero scenography.

Gulfood (Dubai, DWTC + Expo City)

Food and beverage giants. Tasting bars, cold chain, food handling permits all add layers. Build for sampling flow first, brand expression second.

BIG 5 (Dubai, DWTC + Saudi edition Riyadh)

Construction, MEP and infrastructure. Industrial brands, technical product demos, heavier rigging and material handling. Saudi edition in Riyadh — different permitting and contractor pool.

The shared checklist

  • Floor space booked (12+ months out)
  • Stand contractor briefed and appointed (4–6 months out)
  • Creative concept and content locked (3 months out)
  • AV, demo rig and lead capture stack confirmed (8 weeks out)
  • Hospitality, meeting calendar, VIP plan (6 weeks out)
  • On-show standby crew, daily debrief and lead handoff (live)

Frequently asked questions

How early should we book stand space at GITEX?

For prime hall positions, 9–12 months out. Late bookings get whatever is left, usually in lower-traffic halls.

Can the same contractor deliver across all four shows?

Yes, if they have in-house workshop capacity and a real PM bench. A single contractor across the calendar simplifies brand consistency and procurement.

What is the typical build-up window at DWTC?

Usually 3–5 days for custom stands, depending on hall and show. Hanging rigs and double-storey builds extend it. Build-up windows compress fast — late contractor appointment means rushed build.

Are meeting pods worth the floor space?

For B2B shows (Arab Health, BIG 5) absolutely. For visual-first shows (GITEX hero brands, Gulfood sampling) less so. Match the layout to the ROI model.